Assessment Studies
- Customer RE Compatibility Assessment (CRECA)formerly known as Distribution Impact Study (DIS) - A study conducted by Meralco to determine the potential effect of the customer's solar installation to Meralco's distribution system
APPLICATION TYPE | Net-Metering | |
---|---|---|
Type | 1 | 2 |
Category | 100 kW and Below | |
Required Assessments | Technical Impact Study | Technical Impact Study / Field Verification / Systems Parameter Measurements |
Inclusive of |
1. Circuit Modeling 2. Loadflow and short circuit analysis 3. Voltage study 4. Verification of penetration limit |
1. Circuit Modeling 2. Loadflow and short circuit analysis 3. Voltage study 4. Verification of penetration limit 5. Field Verification of existing secondary distribution 6. Load Profiling 7. Measurement of baseline system and power quality parameters 8. Verification of thermal loading and voltages |
Description |
Meralco simulates the proposed RE installation to the proposed RE installation to the customers load and its impact to the grid. This is to determine if the proposed RE installation will be safe to the customer and neighboring grid, or if additional facilities are needed. The simulations are performed off-line and does not cause interruption to the customers use of electricity. |